Trail Projects for Bid

Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.

Professional Trailbuilders Professional Trailbuilders

Carson City 5th Street Trails Project

Repair, realignment, and construction of the non-motorized trail system adjacent to the 5th Street Trailhead on the Prison Hill Recreation Area.

Read More
Professional Trailbuilders Professional Trailbuilders

BPA Lane-Wendson

Project Description: Project is for Trail access from Oregon State Highway 126 up to BPA transmission line towers for future maintenance. Project includes 2 separate trails, 2 Wood bridges with hand rails, and 7 switchback landings. 

Read More
Professional Trailbuilders Professional Trailbuilders

Nature Loop Bridge and Boardwalk Replacement

The Nature Loop Repair and Enhancement project is located within the Tahoe Donner Association property, within the Trout Creek Watershed. A three 2.5 mile loop is slated for complete rehabilitation and repair in the late summer of 2019.  

Read More
Professional Trailbuilders Professional Trailbuilders

Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land conservation organization based in Bucksport, Maine, is seeking to hire a trail contractor to construct approximately 1425’ of new trail construction, 1105’ of basic trail restoration, and 1635’ of minor trail restoration.

Read More
Professional Trailbuilders Professional Trailbuilders

McCarran Ranch Trail Rehab

Proposed work includes installation of culverts, trail restoration, repair, new trail construction (2758 LF), and Aggregate surfacing. Near Reno, NV

Read More
Professional Trailbuilders Professional Trailbuilders

Rush Trail Extension Phase 1

Draper City is seeking competitive sealed proposals from qualified, licensed trail contractors to provide final design and construction services for approximately 0.8 miles of the Rush Mountain Bike Trail Extension Phase 1.

Read More
Professional Trailbuilders Professional Trailbuilders

RFQ - Design and Build Services for the Baker Creek Preserve Bike Park

The City of Knoxville seeks to pre-qualify up to three (3) Bike Park Firms or Teams to provide professional services to finalize design plans; prepare stamped construction plans, specifications and details; and manage the construction of a mountain bike skills park as part of the Urban Wilderness Gateway Park Project at Baker Creek Preserve.

Read More
Professional Trailbuilders Professional Trailbuilders

Atwood Park Silent Sports - Phase 1, Rockford, IL

This project includes the construction of 4.5 miles of natural surface, multi-purpose trails, a 24 space trailhead parking lot, and water service with bike wash station within Atwood Park.

Read More
Professional Trailbuilders Professional Trailbuilders

Chambers Grove Interpretive Trail Construction

Construct approximately 2,075 linear feet of accessible interpretive trail, including gravel-surfacing and boardwalks within Chambers Grove Park in Duluth, MN

Read More
Professional Trailbuilders Professional Trailbuilders

Prineville, Oregon. 66 Expansion

Seeking builders for approximately 1 mile of 5-7% average grade, 48 inch width on average, with no less than 36 inch width at any time, multiuse trail

Read More
Professional Trailbuilders Professional Trailbuilders

John Day Bike Park Phase 1, OR

specified trail construction for approximately 1.5 miles of mountain bike trails located at a new bike park

Read More