
Trail Projects for Bid
Photo: Timberline TrailCraft
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to the trail industry.
Holistic and Sustainable Trails Plan for Midewin National Tallgrass Prairie (MNTP) in IL
The National Forest Foundation and U.S. Forest Service invite experienced trail planning consultants to submit quotes for the development of a Holistic and Sustainable Trails Plan for Midewin National Tallgrass Prairie (MNTP). The Trails Plan will be the roadmap to develop and maintain a shared use network of non-motorized trails that span the 15,000+ acres at Midewin National Tallgrass Prairie and increase connectivity with adjacent communities and other public lands.
Trail Construction Project in PA
The Rothrock State Forest- Musser Gap trail construction project was developed through recommendations made in a forest-wide trail assessment, the purpose of which was to provide options and recommendations toward decreasing the natural surface trail density and visitor crowding in the Forest and creating a more manageable, sustainable trail system.
Trail Maintenance, Relocation, and Restoration + Bridge Construction in MI
PotoMBA is seeking qualified contractors for approximately 3.85 miles of backcountry trail relocations, 0.5 miles of heavy maintenance, 0.22 miles of trail closure/restoration, and the construction of two short trail bridges on the Potawatomi Trail near Pinckney, MI
Build and Refurbish MTB Trails in MN
The purpose of this Request for Proposals (RFP) is to evaluate and select qualified natural surface trail building contractors (i.e., Builders or Contractors) to build and refurbish trails of various types and levels of difficulty.
Open Space & Trails Signage Workplan in Breckinridge, CO
The Town of Breckenridge (Town) will accept proposals from interested parties for the Town Open Space & Trails Signage Workplan. The project will be focused on creating a comprehensive and cohesive Signage Workplan to support the recently adopted Open Space & Trails Master Plan.
Bike Park Construction in MN
The City of Mason City Iowa in conjunction with North Iowa Human Powered Trails and Destination Iowa seeks proposals to build a bike park facility which includes: Bike Park, Youth Bike Playground, Progressive skill Pump track, various single track trails.
Contractor to Install Boardwalk and Puncheon in MN
The Superior Hiking Trail Association is looking for a contractor to install Some boardwalk and puncheon in Hovland, MN. The boardwalk uses steel pan footings that accept a 4x4 post. Lumber and materials have been purchased by the SHTA.
Multi-Use Trail Construction in TN
The Trail and Bike Contractor will be responsible for building a multi-use mountain bike 3-mile trail and a 3-mile pedestrian walking trail within Camp Jordan Park on the city-owned 55 acres located north of and adjacent to Camp Jordan Park.
Request for a Project Manager/Construction Management in Canada
MORATA has received approval to construct a number of trails and we are looking for a project manager (PM) to manage our project from start to finish. All trail construction must be completed in 2 summers (trail completion to be complete no later than September 30th, 2025). The PM will be responsible for providing services to meet the deliverables as outlined in 2.0 Scope of Work of the RFP.
Construction of Multi-Use Trail in TX
Approximately 20-25 miles of natural and improved surface trails which will include both bicycle and hiking uses, are proposed. The primary purpose of which is to provide an excellent outdoor experience for visitors with a range of abilities. The Project also includes design, procurement and installation of Fiberglass Reinforced Polymer (FRP) or similar, bridges as a part of the trail system.
Construction of MTB and Hiking Trails in MN
Construction of approximately 7.5 miles of beginner to intermediate level mountain bike trails conforming to International Mountain Biking Association (IMBA) design guidelines and standards.
2. Construction of approximately 2.5 miles of pedestrian hiking trails conforming to Minnesota Department of Natural Resources (MnDNR) Trail Planning, Design, and Development Guidelines and US Forest Service (USFS) Outdoor Recreation Accessibility Guidelines.
Hiking Trail: La Verkin Rim to River Project in Utah
Requesting bids for approx. 350' hiking only trail descending from the Virgin River canyon rim to canyon floor approx. 150' below in LaVerkin, Utah. Dark, basalt rock forms canyon rim and abundant fissured basalt rocks litter slopes below. Looking to use this native material to build a combination of trail tread and steps although open to other options.
Trail Clearing in Bitterroot National Forest in MT
Bitterroot Backcountry Cyclists (BBC) is partnering with the USDA Forest Service to complete trail clearing on the Bitterroot National Forest (BNF). BBC is currently accepting bids for a service contract for Trail Opening on approximately 120 miles of trails throughout the Montana portion of the BNF, outside of designated Wilderness areas.
MTB Trail Construction in Michigan
Construct a new 5.8-mile, bike optimized trail system consisting of a mix of beginner through advanced singletrack, flowy gravity trail, and gravity jump lines.
Bear Creek National Recreation Trail Reconstruction
Seeking partners to implement reconstruction of the Bear Creek National Recreation Trail on the Ouray Ranger District. This project prioritizes the protection of natural resources, mitigation of safety hazards, and keeping trail users on the trail. The cope of work focuses on constructing new retaining walls, maintaining and restoring failed retaining walls, installing or hardening shallow stream ford and gully crossings, replacing the railings on pedestrian timber trail bridge, and improving drainage.
Trail Rebuild and Site Improvements in MI
This project consists of site improvements to the Iargo Springs Interpretive Site. The existing vault toilet buildings will be removed and replaced. The existing information kiosk will be removed and replaced with new interpretive signage panels. The existing wood stair, from the upper parking area to the lower boardwalk, will be removed and replaced. The upper observation overlook decking will be removed and replaced. Select areas of the lower boardwalk will also be removed and replaced with at grade pathways, and new elevated boardwalk loops will be constructed across Cooke Dam Pond.
Route Inventory and Trails Conditions Assessment in Washington
Road and trail (route) inventories and trail condition assessments for sections of the Washington Department of Fish and Wildlife (WDFW) Scatter Creek, Wenas, W.T. Wooten, L.T. Murray, and Columbia Basin Wildlife Areas, and for route inventory on Cowlitz Wildlife Area.
Biking & Hiking Trail Construction in Minnesota
Approximately eight miles of mountain bike trails and three miles of pedestrian hiking trails are proposed to be constructed in 2024 season. Mountain bike trail features will include a jump line trail, rock gardens, rock drops, and embankment turns. A pedestrian hiking trail system will be integrated around the perimeter of the mountain bike trail system with several smaller looped trails within the east and west segments of the site.