Construction and Rehabilitation of Highway Vehicle Trails - TX

This project includes up to 24 miles of trails including construction of 14.4 miles of new trails and 9.62 miles of rehabilitated trails. The entirety of the trails on this project will be designed for off-highway vehicle traffic. A preliminary site assessment was conducted in January of 2023. All existing trails were geolocated and new trail alignments were proposed. This project includes the final Layout and construction of the proposed new trails along with the rehabilitation of the existing trails as described. Trail signage is also included in this project.

MOSHASSUCK RIVER PRESERVE ACCESSIBLE TRAIL DESIGN - RI

planning and design of a long-lasting, evenly surfaced trail at its Moshassuck River Preserve in Lincoln, RI. The trail will be designed to allow persons with limited mobility, who might otherwise be precluded from hiking trails due to uneven surfaces and dramatic slopes, easier access to the preserve so they may participate in an immersive experience to enjoy the preserve’s natural features.

 Butter Gap Area Trails Project -Pisgah Ranger District, Pisgah National Forest - NC

 Full details of project and RFP will be distributed at Pre-Bid Meeting. Summary below w/ approximate distances:

4.87 Miles New Trail Construction
1.30 Miles Existing Trail Decommissioning 
1.50 Miles Existing Trail maintenance 
Several sections heavy rock armoring 
Heavy Timber Bridges; (2) 30 foot, (2) 20 foot, (2) 16 foot.

CONE PARK – NATURAL SURFACE TRAILS PROJECT -Sioux City, Iowa

The project is located at Cone Park and Sertoma Park and includes construction of new shared-use trails, highly bike optimized bike only trails and mountain bike amenities. The Cone Park site will be located adjacent to the Cone Park Lodge and will provide trailhead access to approximately 10.5 miles of new, sustainably constructed singletrack shared use, and bike only trails, including an intermediate skills trail with prefabricated and natural skill features.

Bitterroot National Forest Trail Opening - MT

BBC is currently accepting bids for a service contract for Trail Opening on approximately 140 miles of trails throughout the Montana portion of the BNF, outside of designated Wilderness areas. The type of work includes: “Logging Out” all downed or leaning trees within the clearing limits (width and height); “Loose Rock Removal” of all rock larger than 6” from the trail tread; and “Drainage Clearing” of all drainage structures.

Park City Dirt Jump Park Redesign and Build - Notice of Request for (Non-bid) Proposals

The City has the desire to redesign and build a sustainable park that meets applicable industry and safety standards which, once built, requires less maintenance over time with more manageable surfaces, such as an asphalt or hard surfaced pump track, beginner through advanced jump lines, the addition of durable lips, and skills section.