Trail Projects for Bid
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.
ROCKY BRANCH PARK IMPROVEMENTS – CAROLINA THREAD TRAIL BELMONT EXTENSION
Construction of Phase 1 - 0.65 miles of multi-use trail
Pole Mountain Trail Construction (WY)
±10,200’ of new, natural surface, non-motorized trail on the Pole Mountain Unit of the Medicine Bow National Forest east of Laramie, Wyoming.
Switchback Construction and ~1000' of Trail construction (OH)
Approximately 1000 feet of new natural surface trail that includes approximately 4 switchbacks will need to be designed constructed by the vendor.
La Junta Bridge Replacement (NM)
The contract shall be for the construction of a 44 ft trail bridge over the Red
River near the confluence of the Rio Grande River.
Project Title: Sunriver Trail Kiosk Project
This RFP is for the construction of the three two-panel kiosks, The kiosks will be constructed out of wood posts, columns and plywood boards, and follow a similar design as the kiosk located at the Phil’s Trails parking area near Bend, Oregon.
Oregon Timber Trail Alliance - Natural Surface Trail Construction and Rehabilitation
The purpose of this RFQ is twofold:
1) Find a suitable contractor to execute a portion of the Watson Fire Rehab project in Lake County Oregon, funded by a Recreational Trails Program (RTP) grant. Note: this is the only project under consideration in the near term.
2) Identify a list of qualified professional trail builders to be considered for future OTTA trail construction projects.
NPR Downhill Bike Trail Extension Design and Build
Design and construction of one (1) intermediate mountain bike directional flow trail on Emerald Mountain in Steamboat Springs, Colorado.
2020 MAAH DAAH HEY- Sully Creek Surfacing
Project Description: restore tread and surface approximately two miles of the MDH trail in the Sully Creek Campround area south of Medora, ND
Settlers Bay Coastal Bike Park Design
The Matanuska-Susitna Borough (Borough) intends to hire a contractor for design of Bike Park within the Settlers Bay Coastal Park near Wasilla, AK.
Tivoli Preserve Trail & Park Improvements
Company/Organization/Agency Submitting Contract: City of Albany, NY
Peerless Pier Building for a Bridge-Minnesota
We seek a contractor capable of building concrete-and-timber piers (abutments) for a bridge on the nationally renowned Superior Hiking Trail (SHT) in northeastern Minnesota.
Harbor Hill Environmental Sanctuary (WA) - VEGETATIVE BUFFER LANDSCAPING
The basic scope of work will be to salvage, purchase and plant landscaping plantings in two buffers and a berm.
Harbor Hill Environmental Sanctuary (WA) - ADA Trail and Signage
RFP to design and construct approximately one (1) linear mile of multi-purpose ADA pathway/trail and service road; educational, name/place and educational signs; fountain structure; park benches; and, other preserve amenities
Harbor Hill Environmental Sanctuary, WA - PROFESSIONAL, ARTISTIC & CONSTRUCTION SERVICES
The intent of this RFP is to obtain a qualified Contractor(s) to provide essential professional, artistic and construction services to design, create and install an entry sign composed of two environmental art sculptures, park name sign and Founder’s Recognition sign.
Shelden Trails Development and Construction, Michigan
Scope: 1.92 Miles of hand cycle accessible trail; 1.74 miles of intermediate/difficult singletrack; 0.64 Miles of trail intended to be accessible