Trail Design & Engineering in North Carolina

 The County of Burke, Friends of Fonta Flora, and Overmountain Victory North Carolina State Trail Friends Group are seeking the professional services of a qualified professional firm or team of firms to provide design services and construction documents for three separate sections of the co-located Fonta Flora State Trail (FFST) and Overmountain Victory State Trail (OVST) in the western part of Burke county.

Hiking Trail Rebuild in MN

The Superior Hiking Trail Association is seeking proposals to renew a one-mile section of a popular loop hiking trail on the Cascade River, 10 miles west of Grand Marais, MN. The work involved will include structure construction (puncheon, boardwalk, timber steps), tread rehab, and 5 short reroutes from 50 feet to 600 feet in length, totaling just under 1000 feet. The trail is much loved, and the maintenance is much deferred. We hope to complete all of the work during the 2024/25 construction season.

MTB Trail Design and Build in ID

The purpose of this request for proposals is to solicit bids from contractors interested in designing and building approximately three miles of new mountain bike-optimized, two-directional trail on Schweitzer Mountain Properties (SMP) -owned property between the roundabout on Schweitzer Mountain Road (4,250 feet) and Spires Spur (5,250 feet) in Sandpoint, Idaho.

Hiking Trail Construction & Rehabilitation in MN

The Superior Hiking Trail Association is seeking proposals to renew a very popular loop hiking trail on the Bean and Bear Lakes Loop that is about 5 miles long. The work involved will include structure construction (puncheon, boardwalk, timber steps), tread rehab, and some short (300 and 600 feet) reroutes, and one longer reroute that is about a mile. It also includes rehabilitation of a campsite with the construction of 6 new tent pads. There is abundant native stone that we would love to see put to use as durable trail features! The trail is much loved, and the maintenance is much deferred. Half of the work is to be completed during the 2024 season, and the rest during 2025.

Design-Build Singletrack Mountain Bike Flow Trail in FL

The Leon County – City of Tallahassee Blueprint Intergovernmental Agency (“Agency”), requests Statements of Qualifications ("SOQ”) from Design-Build Firms (“Consultants”) to provide design and construction services for a mountain bike trail at the Debbie Lightsey Nature Park (“Project”) in Tallahassee, Leon County. 

Construction of Natural Surface Hiking Trail in OH

To Whom would you like your solicitation available: Open to the Public

Project Title: Jesse Owens Straker Hiking Trail

Project Solicitation Number (if any): SRC0000014686

Project Description: The Straker Trail, once completed, will be nearly 30 miles of professionally designed and constructed natural surface hiking trail. The trail will connect to the Buckeye Trail west of Belle Valley in Noble County, pass through Muskingum County near The Wilds and join the Buckeye Trail again in Morgan County near the Dyes Run Trailhead. The intent, upon completion, is that this will be a non-motorized, all weather, natural surface hiking trail that creates a loop around the new Appalachian Hills and Jesse Owens State Park lands. Phase 1 project - The first section of trail is in southeast Muskingum county all of which is through previously disturbed mine lands that are now part of the park and wildlife areas. Approximately 6 miles of trail will be built during this first phase using funds privately donated to the ODNR by the Straker Foundation specifically for hiking trail in Muskingum County. Our consultant has provided design criteria, details/specifications, and centerline of the trail corridor with the assistance of Parks & Watercraft and Wildlife as part of the bid package.

The contract will be awarded to the highest scoring responsive and responsible bidder as determined by the State.

Company/Organization/Agency Submitting Contract: Ohio Department of Natural Resources

Primary Contact for Contract Information: Mark Allen

Email Address: mark.allen@dnr.ohio.gov

Closest City to Project: Zanesville

State/Province/Region: Ohio

Country: United States

Pre-Bid Meeting Date: December 18, 2023

Pre-Bid Meeting Time: 11:00 AM

Anticipated Project Start Date: February 01, 2024

Application Deadline: January 04, 2024

Additional Project Bid Information: All inquiries and bids must be submitted in Ohio Buys. https://ohiobuys.ohio.gov/page.aspx/en/bpm/process_manage_extranet/20999

Date Submitted to PTBA: December 07, 2023

Multi Use Trail Construction in UT (Spring Hollow Trail) - Phase 2

The project area is located approximately 12 miles north of St. George UT. The Dixie National Forest conducted an Environmental Assessment (“EA”) titled the “Spring Hollow and Grass Valley Mountain Biking Project”. This includes 43 miles of new natural surface singletrack trails to be developed for mountain biking, adaptive cycling, hiking, and trail running in the Spring Hollow Trail Project.

Accessible Trail Design and Build in MA

Williamstown Rural Lands invites proposals from qualified contractors for the construction of an accessible trail that will meet the US Access Board’s Accessibility Guidelines for Outdoor Areas (AGODA) at our Oblong Road Property in Williamstown, Massachusetts. The project will include 220’ of naturally surfaced trail, a two-vehicle parking area, a picnic area, and a viewpoint overlook.

19.56 Miles of Multi-Use Trails in CA - Phase 1

Butte County Resource Conservation District (BCRCD), in collaboration with the Forest Service (FS) Almanor Ranger District, Lassen National Forest, is seeking bids from qualified Trail Contractors (Contractor) to complete the construction of Phase I of the Colby Mountain Project- 19.56 miles of a non-motorized, multi-use, trails in Jonesville, California.

Turnagain Pass Trail Design and Construction in AK

The Turnagain Pass Trail Design/Build Project is for the design and construction of an unbuilt approximately 5-mile segment of the Iditarod National Historic Trail (INHT) on the Chugach National Forest in Alaska.. This project will continue construction from the current northern terminus on the lower reaches of Turnagain Pass to a connection point on the Seward Highway at sea level. Design and construction should be complete by December 1, 2025 or 2026.

MTB Trail Construction in GA

Create a locally significant, high quality mountain bike optimized trail system and that offers feature rich trail experiences that are technical and well constructed. Build a 2-mile loop intermediate, or “blue”, level bike optimized mountain bike trail with TTFs and a 1-mile expert, or "black", level bike optimized mountain bike trail with TTFs that ties into 1-mile of pre-existing trail to create a loop. A 50ft handbuilt on the expert loop by volunteers will be incorporated. Trail runners and hikers will also have access to these trails. The trail should not only provide for mountain bike optimized recreation, but also ensure natural resource protection through stabilized spoils and positive drainage. The trail shall be intended for foot and bicycle traffic only.