Trail Projects for Bid
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.
19.56 Miles of Multi-Use Trails in CA - Phase 1
Butte County Resource Conservation District (BCRCD), in collaboration with the Forest Service (FS) Almanor Ranger District, Lassen National Forest, is seeking bids from qualified Trail Contractors (Contractor) to complete the construction of Phase I of the Colby Mountain Project- 19.56 miles of a non-motorized, multi-use, trails in Jonesville, California.
New Trail Segment on Velomont Trail, VT
This section of trail is to be built as a mountain bike-optimized multi-use trail that is approximately 3-miles long depending on final trail alignment and includes approximately 400 linear feet of rock hardening.
Turnagain Pass Trail Design and Construction in AK
The Turnagain Pass Trail Design/Build Project is for the design and construction of an unbuilt approximately 5-mile segment of the Iditarod National Historic Trail (INHT) on the Chugach National Forest in Alaska.. This project will continue construction from the current northern terminus on the lower reaches of Turnagain Pass to a connection point on the Seward Highway at sea level. Design and construction should be complete by December 1, 2025 or 2026.
MTB Downhill Trail Construction in ID
The current project includes 1.76 miles of new, already flagged and designed mountain bike optimized, downhill only, advanced mountain biking trail, along with an additional alternative 500 linear foot climbing segment to replace a steep, existing stretch of trail at the lowest trailhead in the Lower Basin trail system.
MTB Trail Construction in GA
Create a locally significant, high quality mountain bike optimized trail system and that offers feature rich trail experiences that are technical and well constructed. Build a 2-mile loop intermediate, or “blue”, level bike optimized mountain bike trail with TTFs and a 1-mile expert, or "black", level bike optimized mountain bike trail with TTFs that ties into 1-mile of pre-existing trail to create a loop. A 50ft handbuilt on the expert loop by volunteers will be incorporated. Trail runners and hikers will also have access to these trails. The trail should not only provide for mountain bike optimized recreation, but also ensure natural resource protection through stabilized spoils and positive drainage. The trail shall be intended for foot and bicycle traffic only.
Accessible trail construction and trail upgrades in VT
3,000' +- Pathway Built to Accessibility Standards around the Bethel Athletic Fields and 3,000'+- surface upgrades to Carla's Meadow Trail.
Survey and Engineering of ~5-mile Paved Bike Path in NM
On behalf of Taos Pueblo, the Enchanted Circle Trails Association seeks qualified candidates to submit a proposal for the Survey and/or Engineering of a 5-mile muti-use paved pathway to be located east of NM150 between US64 and Arroyo Seco in Taos County, NM.
Alum Creek State Park Mountain Bike Trail Extension: Columbus, Ohio
The trail construction project is located between Alum Creek Reservoir and Africa Road and within the boundaries of map coordinates 40.240243, -82.962718 to the north and 40.219731, -82.956627 to the south. This project will connect two existing mountain bike trails at Alum Creek known as P1 and P2 enabling trail users to ride both trails without needing to ride on Africa Road or drive to the other trailhead.
The new trail will be constructed to meet International Mountain Bicycling Association standards for sustainable trails and Kootenay Adaptive Sports Association adaptive mountain biking trail standards.
CAMBA Trail Reroute and Rehab - Ojibwe Trail - WI
This project will include up to 3 miles of hand-built reroutes, plus drainage rehab and installation and spot rehab work. The project trail is 18" - 24" wide with a desired level of difficulty of Moderately Difficult/Blue and will include occasional rock features and optional B lines.
Region 8 Blanket Purchase Agreement (BPA)
The intent of this BPA is to provide coverage within 5 categories of activities related to recreational trails within the Southern Region of the Forest Service which includes National Forest System lands in Alabama, Arkansas, Oklahoma, Florida, Georgia, Kentucky, Louisiana, Mississippi, North Carolina, Puerto Rico, South Carolina, Tennessee, Texas, and Virginia. These 5 categories are further described detail in the solicitation but are categorized as follows:
- Field Locating, Trail Assessment, and Operational Planning
- Project Management and Facilitation
- Trail Construction
- Trail Maintenance
- Training
Mason City Bike Trails - IA
Approximately three miles of singletrack mountain bike trails of varying skill levels, trail technical features, parking lot space, trail signage, retaining wall, and wooden boardwalks.
Hanging Lake Trail Reconstruction, White River National Forest, Garfield County, Colorado
Seeking a team of experts to repair, restore, and reconstruct the Hanging Lake Trail. Work includes but is not limited to; trail construction and reconstruction, replacement of 7 existing bridges, installing a boardwalk at Spouting Rock, stabilization of the historic Civilian Conservation Corps (CCC) shelter, stream restoration, replacement of wayfinding and interpretive signage, and construction of an improved trailhead.
LaVerkin Rim to River Trail - UT
Requesting bids for approx. 350' hiking only trail descending from the Virgin River canyon rim to canyon floor approx. 150' below in LaVerkin, Utah. Dark, basalt rock forms canyon rim and abundant fissured basalt rocks litter slopes below. Looking to use this native material to build a combination of trail tread and steps although open to other options.
COTA - Tiddlywinks Trail Maintenance -OR
This RFP is to conduct trail maintenance of a 1.3-mile portion of Tiddlywinks, a mountain bike trail near Bend, OR, with jumps and berms that is popular with locals, tourists, youth programs, and riders of adaptive bikes.
Design-Build for Constitution Park Trails - MD
The City of Cumberland, Maryland is accepting proposals to provide design-build services for the design and construction of multi-use mountain bike and pedestrian trails in Constitution Park in Cumberland, Maryland.
Prefabricated Mountain Bike Riding Structures for Spirit Mountain - MN
City of Duluth seeking prefabricated Riding Structures for Spirit Mountain
Stone Eater Bike Park Cross Country and Skill Trails - IN
The Contract work provides for the Stone Eater Bike Park - Cross Country and Skill Trails - Natural Surface mountain bike trail construction and natural material mountain bike trail feature construction, for Lebanon, Indiana
Construction of Coppel Extension Trail - OH
Construction of a 0.52-mile, multi-use, paved trail connecting the existing multi-use trail at the intersection of U.S. 50 and C.R. 608 to the Don Coppel Athletic Complex located at 134 Star Drive, Chillicothe OH, 45601.
Design Services for a NICA Racecourse/Adaptive Mountain Biking Trail and Additional Intermediate Mountain Biking Trails.
RFQ for design, production of construction documents, and construction supervision for the construction of a premier NICA racecourse/adaptive mountain biking trail