Trail Projects for Bid
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.
GAOA Primrose Trail Reconstruction, AK
The project consists of five miles of trail rehabilitation, including the replacement of six trail bridges.
Lodestone XC Bike Park Project - SLC, UT
Requesting bids from qualified trail/bike park designer/builder to consult on improvements to a non-motorized recreational cross-country style bike park and produce a design and plan for implementation of the project.
Adaptive Trails - Patapsco Valley State Park - MD
Modification to existing trails to meet Adaptive standards
Bethel Green Links Trail Projects - Outer and Mid Loop RFP- VT
-2.5 +- Mile Multi-Use Trail Built to IMBA Standards.
-Two Reroutes and Upgrades to Mid Loop Trail
Cascade Locks Trail Construction - OR
This RFP is to construct approximately 3.3 miles of new bike-optimized, multi-use singletrack trail. Located due east of Cascade Locks, OR, the site is on what is known as Wyeth Bench, to the north and below the Gorge Face.
Perry County Legion Lake Multi-Use Trail - MO
The project shall consist of the construction of approximately 4.5 miles of single-track trail made of natural materials in keeping with the natural landscape and pedestrian biking/walk bridges. This project will also consist of the construction of three bike-only directional mini flow trails, a bike handling skills trail, and dirt pump track
Smith Park Mountain Biking RFP - TN
The City of Brentwood seeks a contractor to construct a mountain bike trail in Smith Park in Brentwood, TN.
GAOA Council Mountain Trail Reroute - Payette NF - Idaho
This project reroutes the Council Mountain Trail on the Council District of the Payette National Forest. The reroute moves the trailhead closer to Cabin Creek Campground to provide access without crossing private land. Work includes mobilizing equipment, excavation, clearing and grubbing, brushing, seeding construction of fords, climbing turns, and drain dips, and all related work.
Maybury Assessment & Concept Design - MI
This is a request for bids for a trail assessment and concept design (Work) focused on the identification and mitigation of eroded sections and overall improvement of the mountain bike trail at Maybury State Park located in Northville, Michigan.
Lower Carpenter Valley Puncheon Trail - CA
51ft of raised puncheon trail. North of Truckee
Teton Canyon Parallel Trail Construction
Seeking a qualified contractor to provide quotes for the construction of a 0.65 mile long multi-use trail located in Teton Canyon, 2.5 miles East of Alta, WY.
Monongahela NF Monday Lick Contemporary Trail System Project Indefinite Delivery Indefinite Quantity (IDIQ)
The scope of work shall include the construction of approximately 27 miles of trails, with designed use for Mountain Biking, but permitted shared use.
UNIVERSAL ACCESS TRAIL CONSTRUCTION AT THE ROCK CREEK CONFLUENCE PROPERTY - MT
Five Valleys is seeking proposals from qualified entities to construct 5,100 linear feet of universal access trail at the Confluence property beginning in Fall 2023
Rick's Canyon Connector Trail - Logan, UT
CTA is requesting proposals from qualified individuals or firms to provide trail design services for the Rick’s Canyon connector trail, which will be planned and designed as one trail with multiple entry and exit points. The project build will be implemented in phases. The ultimate scope of work for this project is to create a plan which will stake out a route that connects across the top (east side) of Ricks, to Steel Hollow, over to Trail Hollow connecting to Ephraim’s Cutoff, and finally an easy way (current trail is rated a black trail) down option to Willow Creek—in total approximately 13 miles of realigned and even entirely new trail.
Emerald Mountain Directional Downhill Bike Trail Design - Steamboat Springs, CO
The City of Steamboat Springs is soliciting proposals from qualified contractors to provide professional services for the design and construction of one (1) advanced mountain bike downhill directional trail on Emerald Mountain in Steamboat Springs, Colorado. The trail will be a new trail for advanced riders connecting the top of Emerald Mountain with the base of the Howelsen Hill Ski Area.
Town of Charlotte VT - Portion of Village Loop Trail, South of Ferry Road
The Town of Charlotte is requesting bid proposals from trail construction contractors to build a portion of an existing, unimproved town trail called the “Village Loop Trail” located within easements south of Ferry Road, approximately 1,250 feet in length. Approximately 378 feet of the trail is to consist of puncheon which is to be constructed and installed by the contractor. Construction will also involve the installation of culverts at specified locations, the laying of crushed stone, and the removal of primarily invasive woody vegetation.
Nature Trail Renovation and Construction Phase 1 - Lamberton NJ
This project proposes to construct one new bridge, repair all eroded portions of the existing trail, and construct new trails totaling 4,923 linear feet to expand the existing trail system. Refer to Figure 1 below for details.
Pre-solicitation: Southern Region Trails Blanket Purchase Agreement - US Forest Service.
The intent of this BPA is to provide coverage within 5 categories of activities related to recreational trails within the Southern Region of the Forest Service which includes National Forest System lands in Alabama, Arkansas, Oklahoma, Florida, Georgia, Kentucky, Louisiana, Mississippi, North Carolina, Puerto Rico, South Carolina, Tennessee, Texas, and Virginia.
Central Arizona Project (CAP) Trailhead & Trail Fencing Improvement Project
The base bid for the improvements consists of the provision of all labor, materials and equipment needed for the new and/or modified fencing and gate improvement and the new South Florence Trailhead area at SR 79 and Salazar St. The following three additive alternates may be added to the work at the County’s discretion.
1. Add-alternate 1 – Picacho Trailhead
2. Add-alternate 2 – Cactus Forest Trailhead
3. Add-alternate 3 – Trail Improvements and Signage
Velomont Trail - Swans Mill Single Track - VT
The purpose of this RFP is to solicit proposals for the construction of a new section of the Velomont Trail.