Hanging Lake Trail Reconstruction, White River National Forest, Garfield County, Colorado

Project Description: Hanging Lake is an iconic and popular historic tourist destination located within the White River National Forest. In late July of 2021, a debris flow originating from the Grizzly Creek fire burn scar significantly damaged the Deadhorse Creek drainage, including the hiking trail. The debris flow covered major trail sections, swept away bridges, downed trees, and buried the trail in mud, boulders, and logs. Following the debris flows, White River National Forest (WRNF) staff, the National Forest Foundation (NFF), and our partners have developed plans to construct a more sustainable and resilient trail to match this world-class destination and plan for the next 100 years.

The NFF is seeking a team of experts to repair, restore, and reconstruct the Hanging Lake Trail. Work includes but is not limited to; trail construction and reconstruction, replacement of 7 existing bridges, installing a boardwalk at Spouting Rock, stabilization of the historic Civilian Conservation Corps (CCC) shelter, stream restoration, replacement of wayfinding and interpretive signage, and construction of an improved trailhead.

Company/Organization/Agency Submitting Contract: National Forest Foundation

Primary Contact for Contract Information: Emily Kasyon

Email Address: ekasyon@nationalforests.org

Closest City to Project: Glenwood Springs

State/Province/Region: Colorado

Country: USA

Pre-Bid Meeting Date: October 31, 2023

Pre-Bid Meeting Time:

Anticipated Project Start Date: April 15, 2024

Application Deadline: December 11, 2023

Additional Project Bid Information: A link to the RFP can be found here: https://www.nationalforests.org/rfp/hanging-lake-trail-reconstruction-white-river-national-forest-garfield-county#filters

Two pre-bid site visits are being held on Tuesday, October 31st and Thursday, November 9th. Although attendance is optional, prospective bidders are highly encouraged to attend one of the site visits. It is not necessary to attend both. An RSVP to 
ekasyon@nationalforests.org is necessary to confirm site visit attendance.

Date Submitted to PTBA: October 09, 2023

Previous
Previous

Mason City Bike Trails - IA

Next
Next

LaVerkin Rim to River Trail - UT