Trail Projects for Bid
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.
RFP: Trail Design, Ramp, Newton Street Park, Colmar Manor, Maryland
Seeking proposals from qualified firms to provide professional design services for an elevated wooden ramp (Bike/Ped) that is part of a trail development project on public land in Prince George’s County, Maryland.
Flathead National Forest - GAOA Trail Clearing - MT
The work involves performing Specification Clearing on select non-wilderness trails on Hungry Horse-Glacier View Ranger District that have not been maintained in some time. The type of work includes “Logging Out” all downed or leaning trees within the clearing limits, removing sticks, and re-cutting previously cut logs that do not meet clearing specification and standards. Trail clearing standards, specifications and performance requirements are detailed in the attachments to this notice.
Grizzly Creek, Jess Weaver, and Cutover Trail Repair and Restoration - CO
The scope of this project includes trail tread repair, reconstruction, and stabilization as well as an optional trail bridge replacement following extensive damage from debris flows originating from the Grizzly Creek Fire burn scar.
Moosehead Outdoor Alliance Mountain Bike Trail Building - ME
7 MILE SINGLE TRACK MOUNTAIN BIKE TRAILS IN GREENVILLE MAINE AREA
Lowes Creek Skills Park and Playground - WI
Seeking proposals for plans and conceptual designs for two skills areas: a bicycle playground and skills park for strider to green riders, and a ~3.5 acre skills park targeted to more-experienced riders.
New Velomont Trail Segment - Braintree, VT
This section of trail is to be built as a mountain bike-optimized multi-use trail that is approximately 1 mile long depending on final trail alignment. All new trail design and construction must follow International Mountain Bike Association (IMBA) sustainable trail building standards.
Huck Finn Park - Leadville, CO
Redesign and construction of a sustainable jump and skills park surrounding the asphalt pumptrack to meet applicable industry and safety standards which, once built, requires less maintenance over time with more manageable surfaces, beginner through advanced jump lines, the addition of durable lips, and skills section.
Doris Wigington Park Mountain Bike Trails - GA
The City of Jasper, Georgia (herein referred to as “Client”) is seeking a professional trail builder to provide an experienced trail crew to perform specified mountain bike trail design-build construction on shared-use (bike/hiking/trail running) trails in Doris Wigington Park
Construction and Rehabilitation of Highway Vehicle Trails - TX
This project includes up to 24 miles of trails including construction of 14.4 miles of new trails and 9.62 miles of rehabilitated trails. The entirety of the trails on this project will be designed for off-highway vehicle traffic. A preliminary site assessment was conducted in January of 2023. All existing trails were geolocated and new trail alignments were proposed. This project includes the final Layout and construction of the proposed new trails along with the rehabilitation of the existing trails as described. Trail signage is also included in this project.
Peninsula State Park (WI) Mountain Bike Trail Design RFP
Peninsula State Park is requesting proposals from qualified Mountain Bike Trail Designers capable of providing site condition assessments, complete conceptual design and cost estimates, design development documents and cost estimates, and construction documents for the new mountain biking network.
MOSHASSUCK RIVER PRESERVE ACCESSIBLE TRAIL DESIGN - RI
planning and design of a long-lasting, evenly surfaced trail at its Moshassuck River Preserve in Lincoln, RI. The trail will be designed to allow persons with limited mobility, who might otherwise be precluded from hiking trails due to uneven surfaces and dramatic slopes, easier access to the preserve so they may participate in an immersive experience to enjoy the preserve’s natural features.
Chestnut Ridge Park Eternal Flame Trail Safty Enhancement - NY
Reconstruction of segments of the Eternal Flame Trail in Chestnut Ridge Park to incude steping enhancements on the desending trail, readjusting trail pathway along the stream bed and clearing stream bed of fallen timbers the purpose of which is to significantally improve the saftey of the trail hike.
Butter Gap Area Trails Project -Pisgah Ranger District, Pisgah National Forest - NC
Full details of project and RFP will be distributed at Pre-Bid Meeting. Summary below w/ approximate distances:
4.87 Miles New Trail Construction
1.30 Miles Existing Trail Decommissioning
1.50 Miles Existing Trail maintenance
Several sections heavy rock armoring
Heavy Timber Bridges; (2) 30 foot, (2) 20 foot, (2) 16 foot.
Turtle Bayou Nature Preserve, TX
The extent of this project is to add approximately 1.5 miles of 6’ wide, natural-surface trails to the existing, 3.8-mile trail network. This project will complete a large loop trail and smaller inner loop on the East tract of the nature preserve and will increase the total length of recreational hiking trails to more than 5 miles.
CONE PARK – NATURAL SURFACE TRAILS PROJECT -Sioux City, Iowa
The project is located at Cone Park and Sertoma Park and includes construction of new shared-use trails, highly bike optimized bike only trails and mountain bike amenities. The Cone Park site will be located adjacent to the Cone Park Lodge and will provide trailhead access to approximately 10.5 miles of new, sustainably constructed singletrack shared use, and bike only trails, including an intermediate skills trail with prefabricated and natural skill features.
Silver Lake Loop Trail Renovation Project - UT
Complete renovation of ADA compliant trail approximately 2500' in length in Big Cottonwood Canyon at 8,700 feet of elevation, Central Wasatch, Utah. Removal of deteriorated wooden retaining structures and rebuild of a retaining wall using rock approximately 900' in length.
Trail Construction at North Fruita Desert - CO
Construct up to 15.1 miles of single track natural surface trail at the North Fruita Desert Specialized Recreation management Area.
DuPont State Recreational Forest Trail Improvements and Reroutes - NC
The purpose of this contract is to construct new trail tread along rerouted portions of trails, rework and improve sections of existing trails, and rehabilitate sections of abandoned trails in order to make these trails more sustainable in the long run.
Veterans Park Wilderness Trail - NJ
Construction of a fully designed and permitted 4000’ trail along a mountain slope in the Township’s Veterans Park.
Keweenaw Point Trail Phase 3 - Trail Section 1 - MI
The Project consists of construction of a new multi-use trail including, but not necessarily limited to, path construction, boardwalk construction, trail armoring, berm installation, bridge installation, and installation of picnic tables, benches, and bike racks.