Trail Projects for Bid
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.
Rocky Branch Park Improvements - Blue Zone Trails - North Carolina
Construction of 7,000 linear feet of intermediate single track mountain biking trail and other ancillary construction necessary for the completion of this work at Rocky Branch Park
Trowbridge Forest Trail Construction Project: Balsam Connector Trails Phase, Thunder Bay, Ontario
The Balsam Connector Trails Phase includes the construction of beginner and intermediate trails to connect a new trailhead to the existing trail system. The approximate length of the Trail is 3750 meters.
Broadford Park Trail System - Phase 1, Maryland
Construction of 1 mile of Class III Trail in the Broadford Lake Park located in Mountain Lake Park, MD. This trail segment is located primarily on <25% side slope and flat terrain and will require lift and tilt construction of local material to elevate trail tread sufficiently enough to drain and to provide user/bike optimized trail.
Hidden Valley Mountain Bike Trail Construction, MN
Approximately 9 miles of singletrack mountain bike trail construction
Coquina Trail Boardwalk, SC
Construction of ~280' boardwalk on the Coquina Trail sector spanning Shank's Creek in Poinsett State Park as replacement for the original CCC structure that was built during park construction in 1934
Camp trail to Josephine Mine, Bodfish, CA
Maintain / rebuild a trail (1/4 mile) from a campsite overlooking Lake Isabella to the Josephine Mine site.
Sheridan Community Land Trust
Construction of 31,755 +/- linear feet of non-motorized, single and multi-use, 24” – 36” natural surface trail as part of the Red Grade Trails System.
Butterfield Canyon Trail System - Utah
Trails Utah is looking for a group or individual with expertise in developing a multi-phased trail system plan and design.
Rattlesnake Trail, UT
Project is to construct a non-motorized backcountry/singletrack recreational trail to be an alternate route to the Rattlesnake Gulch Trail in Millcreek Canyon, Salt Lake County, Utah.
Parleys Pointe-Bonneville Shoreline Trail Extension
Construction of a non-motorized backcountry/singletrack recreational trail for shared use in the foothills along the east bench of the Salt Lake Valley. Project includes approximately 3.5-4 miles of new Bonneville Shoreline Trail (BST) and an additional half mile of neighborhood connector trails.
Metolius-Windigo Parallel Trail near Bend, OR
Design Build project is a 2.5-mile equestrian and hiking trail in the Deschutes National Forest near Mt. Bachelor.
Trail Planning in WV
Project to develop a four property Fayette County based detailed trail plan that can be used to initiate a funding and grant strategy.
Design Build-Atwood Park Silent Sports-Phase 2
1) A minimum 2-3 miles of multi-use single track in the East Expert Zone
2) The multi-use beginner loop south of the river
3) Development of multi-use return trails between the East Expert Zone, quarry, and Trailhead Zone
4) Development of downhill flow trails within the Trailhead Zone
Rocky Branch Park Improvements - North Carolina
The Green Zone and Blue Zone Trails are the second and third phases of a multi-phased plan outlined in the Rocky Branch Trail Enhancement Plan.
Design & Construction of Mountain Bike Trail - Grapevine Lake, Madisonville, KY.
Design & Construction of Mountain Bike Trail
RFP to develop Guidelines for watercraft launch facilities
Erie Canalway National Heritage Corridor
Preliminary Design - Patapsco Regional Greenway Sykesville to McKeldin
Preliminary design of two segments of the Patapsco Regional Greenway