Rattlesnake Trail, UT

Project Title: Rattlesnake Trail

1/5/21 Update:

Originally posted on November 30th. Pre bid meetings have taken place. Deadline for proposal submittal is now January 25, 2021. Contractors will be notified by Feb. 12th.

Download the updated RFP

Project Solicitation Number (if any): 002-21

Project Description: Trails Utah (TU), a private non-profit 501(c)3 organization, is requesting bids from qualified contractors to construct a non-motorized backcountry/singletrack recreational trail to be an alternate route to the Rattlesnake Gulch Trail in Millcreek Canyon, Salt Lake County, Utah. Project includes determining exact alignments and constructing a new single direction mountain bike climbing and dual direction hiking trail approximately 1-1.5 mile long on an 6-8% average grade with 6 to 10 sets of switchback turns. In addition, we are requesting a separate bid to reroute the top 0.1 mile fall line section of the existing Gulch Trail with a 0.2 mile long section on a 12% grade with three switchback turns.

Company/Organization/Agency Submitting Contract: Trails Utah

Primary Contact for Contract Information: Sarah Bennett

Email Address: sarah@trailsutah.org

Closest City to Project: SLC

State/Province/Region: UT

Country: United States

Pre-Bid Meeting Date: 12/1/2020

Pre-Bid Meeting Time: 1:0:0 PM

Anticipated Project Start Date: 5/1/2021

Application Deadline: 12/15/2020

Additional Project Bid Information: Please contact Sarah for full RFP and supporting documents.

Date Submitted to PTBA: 11/25/2020

Previous
Previous

Butterfield Canyon Trail System - Utah

Next
Next

Parleys Pointe-Bonneville Shoreline Trail Extension