Carolyn Creek Trail Bridge project, Elko NV
We are seeking a quote for the Carolyn Creek Trail Bridge project. Please review the attached solicitation documents for full details. We require your quote and past performance reports no later than December 16, 2024, at 12:00 PM PST.
Key Project Details:
Project Location: Lamoille Canyon, Elko County, NV. Coordinates: 40.616571, -115.376915.Directions: From Elko, NV, drive southeast on NV-227 for 20 miles toward Lamoille, NV. Turn right onto NF-660 (Lamoille Canyon Road) and drive 11.7 miles to the road’s end parking lot. From there, hike 1.4 miles on the Island Lake Trail to the project site.
Performance Period: Start Date: 07/14/2025 Completion Date: 09/12/2025 Notice to Proceed: 05/15/2025
Requirements:
Technical Proposal:Describe how the work will be performed, including methods and techniques for remote site construction. Address traffic control, safety measures, erosion/pollution control, hazardous spill protocols, and staging logistics. Provide a detailed work schedule with a narrative explanation. Include a list of key personnel and their qualifications, along with major equipment planned for the project.
Required Documents:Fill out and submit the RFQ 1240LT25Q0003 document. Complete the Contractor Experience Questionnaire (Attachment J.4). Provide past performance reports for at least three similar projects completed in the last three years. Ensure compliance with Davis-Bacon wage determination (Attachment J.2).
Bonds:Performance and Payment Bonds, each 100% of the contract price, are required within 15 days of contract award.
Additional Information:
Site Visit: Not applicable for this project.
Submission Instructions: Email all proposal documents by the stated deadline. Physical submissions will not be accepted.
Please see the attached documents for your review and completion.
Feel free to reach out with any questions or clarifications.
Best regards,
Angelique S.Green
+1 818 212 0081 Soniat & Willow Inc
UEI CNLGWCBZ3K95
Los Angeles CA 91606