Trail Projects for Bid
Below is a list of projects that have been submitted to the PTBA for bid. Please respond directly to the listing agency for further information or to submit your bid. The PTBA has no control or input into the contracting or solicitation of these projects. We list them strictly as a service to our members and the trail building industry.
Mattoon IL - Pump Track and Bike Park Trail
RFP for pump track, mtb skills course, and bike park completed design and implementation/construction estimates.
Design of a Bike Park in Kentucky
Design of inclusive bike park in 2.6 acre site within a new regional park for community members of all abilities to have fun and improve their bike skills. Seeking qualified professionals to assist with development of plans and cost estimates to be used for fundraising toward construction. Question deadline 9-3-24; proposals due 12:00 pm on 9-13-24,
Design & Construct 4 miles of trail in VT
The Vermont Huts Association seeks proposals to design and construct a 4-mile segment of the Velomont Trail in Rochester, VT, enhancing mountain bike access in the area. Proposals due September 16, 2024.
Trail Bridge Architecture & Engineering Design in Washington
The National Forest Foundation (NFF), in partnership with the U.S. Forest Service, is pleased to announce an RFQ for engineering services for the Architecture and Engineering (A&E) design associated with the replacement of the Heather Lake Trail Bridge on the Mt. Baker Snoqualmie National Forest, Washington.
Design & build 5 miles of multi-use trail in VA
The Roanoke Parks Foundation seeks contractor qualifications for a design/build project in Mill Mountain Park. The proposed scope of work includes designing and building approximately 5 miles of multi-use and bike optimized trail.
Construction of an improved natural surface multi-use trail
Construction of an improved natural surface multi-use trail connecting Lowell to Gaston County’s George Poston Park below Spencer Mountain. This trail segment is a part of the Carolina Thread Trail.
Nova Scotia Jajiktek Seawall Trail Hiking Trail Design and Construction
Inverness County, Nova Scotia seeks proposals to finalize the alignment of a 50 km remote hiking trail, including three remote accommodations sites, and then construct according to the finalized plan.
Accessible and Engaging Interconnected Trail Network Study in IN
Town of Clarksville seeks proposals from qualified planners, engineers, and environmental consultants to develop the Clarksville Accessible and Engaging Interconnected Trail Network Study. The Study will seek to enhance and promote a safe travel experience for all types of users within the thoroughfare network. This study will review the town's proposed future trail system and identify the safest routes to connect the Discovery Trail to Clarksville’s northern residents.
Appalachian Trail Bridge Replacement in SW Virginia
The Appalachian Trail Conservancy is accepting RFP's for the removal and replacement of a USFS-A..T. pedestrian bridge crossing Fox Creek in SW VA, Grayson Co. ATC RFP, USFS Bridge Design Plan, Supplemental Specifications, and other supporting documents can be found using the Google Drive link.
Nature Trail Completion: Erosion control & removal of snags and invasive species in MO
Erosion control with water bars and edging needed on a trail length of approximately 1000 linear feet. Removal of snags and invasive species as needed.
Improve Backcountry Country Trails in VA (USDoT-Funded Project)
This is an USDoT-funded RTP project in partnership with the Appalachian Conservation Corps, the George Washington National Forest and the Shenandoah Valley Bicyle Coalition to improve backcountry trails on the North River Ranger District in Virginia.
Build an ADA-compliant trail & parking space and gravel parking lot in PA
Central Pennsylvania Conservancy is seeking a contractor to build an ADA-compliant trail and parking space, in additon to a gravel parking lot at our Letort Spring Garden Preserve in Carlisle, PA.
Development of 2 individual master plans to study & recommend implementation for future connectivity and sustainability in Virginia
The Gateways to Southwest Virginia: Outdoor Economy Recreation Planning Project is an initiative led by Friends of Southwest Virginia to extend regional outdoor recreation planning to the LENOWISCO and West Piedmont Planning Districts by developing two individual master plans to study and recommend implementation for future connectivity and sustainability of Lee, Wise, Scott, Patrick and Henry counties and the cities of Martinsville and Norton.
Trail Maintenance in Idaho
The Payette National Forest is now accepting bids on the French Creek Bear Pete ridge project. The project clears, brushes and maintains 32 miles of trail. See sam.gov for more information and to submit quotes.
Design & construction of 2.5 miles of trail and 2 kiosks in South Carolina
The design and construction of an approximately 2.5-mile of new trail as a part of the existing 7.5-mile Lake Whelchel trail system and the construction of two kiosks.
Mountain Bike Trail Construction in Canada
MORATA finished constructing an iconic destination trail on Morfee Mountain in Mackenzie BC in the summer of 2023. This trail features 7 km of alpine cross-country riding with stunning views that leads into a 7 km downhill trail that has three distinctive build styles. MORATA has received more funding to continue expanding the downhill cycling network on the lower half of Morfee Mountain. Our vision is to build enough diverse trail to attract a variety of riders at different skill levels and be an attractive destination that riders want to visit year after year.
Trail Clearing and Brushing in Montana
This solicitation is for various combinations of trail clearing and brushing on approximately 33 miles of trail on the Hungry Horse-Glacier View Ranger District on Flathead National Forest in Northwest Montana. An additional 18 miles of clearing and brushing is listed as option items.
Development of 11.7 miles of multi-use trails
The City of Grants Pass, Oregon, is soliciting sealed written proposals from qualified trail construction contractors for the development of approximately 11.7 miles of new dual-purpose and single-use trails, including reroutes, mountain biking descending- and climb-only trails, and two-way routes for hiking and mountain biking.
BPA: USFS Region 9 Trail Construction and Maintenance
R9 Trails BPA 12445524Q0033 SAM.gov (you have to login)
Blanket Purchase Agreement for trail construction and maintenance for USFS Region 9
All-Weather Trail Conversion in ID
Conversion of Harrison Hollow Loop Trail to an all-weather trail and increasing length of trail by approximately 1,200 feet. Trail is located via Harrison Hollow Lane off Bogus Basin Road in N. Boise.