Hanson Nature Preserve Visitor Enhancements - CA

Project Title: Hanson Nature Preserve Visitor Enhancements

Project Description: The proposed Project includes public access improvements to facilitate outdoor appreciation, recreation, and educational opportunities on the Project site. Project specifications are in the attached Landscape Architectural Drawings Package and include: security fencing; a corten steel gate with electronic exit device; an entrance road and a permeable parking lot with bus access made from an aggregate binder, consistent with Americans with Disabilities Act (ADA) requirements; a portable restroom with ADA access; interpretive signage and informational signage (ADA parking and restroom signage); a trailhead kiosk; a lunch area with gabion basket seating, shade sails, and a mobile learning kiosk with day use storage; a walking trail with ADA access; interpretive areas with bench seating; mounded berms using on-site materials; and native vegetative plantings with low-flow irrigation. The total footprint of the Project is roughly 3 acres, and the total length of natural surface trails will be approximately 1.24 miles with 0.16 miles of ADA trail. Site improvements using heavy equipment such as the site prep and grading can only be conducted outside bird breeding season which runs from mid-March to mid-September. Anticipated Project schedule is August 2021 – October 2023. TNC hereby invites contractors to submit technical and price proposals for implementing the Project as described in the attached Landscape Architectural Drawings package. Proposals should include the task breakdown and qualifications described in the Proposal Requirements below and should be limited to no more than 15 pages (exclusive of resumes of key personnel).

Company/Organization/Agency Submitting Contract: The Nature Conservancy

Primary Contact for Contract Information: Kat Selm

Email Address: kat.selm@tnc.org

Closest City to Project: Santa Paula

State/Province/Region: CA

Country: United States

Pre-Bid Meeting Date: 5/17/2021

Pre-Bid Meeting Time: 9:0:0 AM

Anticipated Project Start Date: 8/1/2021

Application Deadline: 7/2/21 (updated on 6.17.21)

Additional Project Bid Information:

Date Submitted to PTBA: 5/3/2021

Documents

Download the RFP (updated 6.17.21)

Landscape Architectural Drawings

Conflict Disclosure Form

Planting List

Previous
Previous

Bitterroot National Forest Selway Wilderness Trail Clearing - ID

Next
Next

Forest Service Region 8 Trails Maintenance and Repair BPA - Southern Region