Construction of new, natural surfaced, non motorized trail in Wyoming

To Whom would you like your solicitation available: Open to the Public

Project Title: Pilot Hill/Pole Mountain Connector Trail Phases 2A and 2B

Project Solicitation Number (if any):

Project Description: The project consists of the Construction of the Pilot Hill/Pole Mountain Connector Trail Phases 2A and 2B on the Pole Mountain Unit of the Medicine Bow-Routt National Forests and Thunder Basin National Grassland, near Laramie, Wyoming. Work includes completion of an on-site investigation of local conditions, furnish all labor, equipment, supplies and materials in performing all operations necessary for the complete and proper development of identified trail infrastructure associated with the project. This contract is for the construction of approximately ±10,134’ of new, natural surface, non-motorized trail for each Phase, for a total of ±20,268’. Specifics of this project will be discussed on the mandatory walk-through.

Work must be completed according to trail standards as contained within this scope of work and shall be substantially completed by October 15, 2024, with all work completed by October 31, 2024. Trail lengths are estimates derived from design work completed from survey by Wyoming Pathways. Preliminary layout of the trail corridor has been completed and the drain-edge flagged representing the trail corridor. As part of this project Wyoming Pathways will pin-flag the trail drain-edge, the contractor is responsible for final field alignment and design generally within a 10’ corridor or as mutually agreed in the field.

Contractor will adhere to Sustainable Trail Construction best practices and guidelines accepted in the professional trail building industry as standards providing the foundation for all design and construction decisions (such as "half rule", frequent grade reversals, max grades function of soils and use, etc.).

Company/Organization/Agency Submitting Contract: Wyoming Pathways

Primary Contact for Contract Information: Michael Kusiek

Email Address: michael@wyopath.org

Closest City to Project: Laramie

State/Province/Region: Wyoming

Country: United States

Pre-Bid Meeting Date: April 26, 2024

Pre-Bid Meeting Time: 10:30 AM

Anticipated Project Start Date: May 30, 2024

Application Deadline: May 10, 2024

Additional Project Bid Information: Other project information and details can be found in the RFP document.

Date Submitted to PTBA: April 12, 2024

Previous
Previous

Plan and construct a rock retaining wall, ramp, and stairs in Taos, NM

Next
Next

Trails Master Planning for Muskingum Watershed Conservancy District (Ohio)