Stonework


Scope Tip

Clearly define the intended function, locations, extent, and finished characteristics of stonework, as well as responsibilities for sourcing, supplying, and transporting stone. Stone availability, material handling, site access, and construction complexity can significantly affect pricing.


Scope Item Definition

Construct trail elements using stone to achieve specified functional, structural, surface, or aesthetic objectives.

Stonework may include stone steps and staircases, retaining walls, stone pitching, rock armoring, paved tread, drainage crossings, and other trail elements incorporating stone.

Stonework may be performed as part of trail tread construction, drainage features, tread hardening and surfacing, trail structures, or specialty trail features, or may be separately defined and contracted.

When / Where It Applies

Stonework may be incorporated into trails to accommodate changes in grade, retain soil, stabilize or harden tread, address drainage, cross obstacles, create a particular trail experience, or achieve desired aesthetic characteristics.

The type and extent of stonework depend on site conditions, intended trail use, design objectives, available materials, and project requirements.

Stonework often involves specialized construction skills and site-specific decision-making. The availability of suitable stone and the effort required to source, move, shape, and place it can significantly influence construction methods, schedules, and costs.

Scope Considerations

Depending on the project, the scope should consider and clearly define:

  • Function and intended outcome: Purpose of the stonework, intended trail users, required performance, and desired finished characteristics.

  • Types, locations, and quantities: Required stonework applications, locations, dimensions, extent, and anticipated quantities.

  • Stone characteristics: Applicable requirements for stone type, size, shape, durability, surface characteristics, and appearance.

  • Material sourcing and supply: Availability of suitable onsite stone, approved collection areas, imported stone requirements, and responsibility for sourcing and supplying materials.

  • Material handling and transportation: Access to stone sources and construction locations, transportation distances, equipment restrictions, staging, and material-handling constraints.

  • Design and construction requirements: Applicable design criteria, drawings, specifications, construction methods, and any required engineering or specialized review.

  • Foundations and supporting elements: Applicable requirements for excavation, foundation preparation, bedding, backfill, drainage, and other associated construction.

  • Finished appearance and workmanship: Desired aesthetic characteristics, level of finish, and applicable requirements for stone shaping, fitting, placement, and finished surfaces.

  • Integration with the trail: Relationship to surrounding tread, grades, drainage, structures, adjacent features, and surrounding terrain.

  • Durability and maintenance: Expected performance and durability in relation to anticipated use, site conditions, materials, and long-term maintenance requirements.

  • Field decision-making: Which stone selections, locations, dimensions, configurations, and construction details may be determined or adjusted in the field.

  • Resource protection and timing: Applicable restrictions on stone collection, equipment use, disturbance, permit conditions, best management practices (BMPs), and seasonal restrictions.

  • Pricing inclusions: Whether stonework is included in other construction pricing or separately quantified and priced, including associated material sourcing, transportation, and construction activities.

Owner-Provided Information

The owner should provide the following, if available and applicable:

  • Approved trail corridor and/or alignment and identified stonework locations.

  • Applicable plans, drawings, typical details, specifications, and design criteria.

  • Identified stonework types, dimensions, anticipated quantities, and required finished characteristics.

  • Information about available onsite or owner-supplied stone, including locations, quantities, and material characteristics.

  • Approved stone collection areas and applicable collection restrictions.

  • Known terrain, soil, rock, drainage, and foundation conditions.

  • Reference photographs or examples communicating the intended type, appearance, and level of finish.

  • Access routes, equipment restrictions, staging locations, and material-transport constraints.

  • Applicable permits, environmental approvals, mitigation measures, BMPs, and resource-protection requirements.

  • Available site photographs, surveys, or other documentation of existing conditions.

Construction Specifications + Field Decision-Making

Clearly distinguish fixed design and construction requirements from decisions that may be made in the field.

The level of design detail and documentation may vary depending on the type, scale, complexity, and function of the stonework. Some applications may follow detailed drawings or engineered designs, where required, while others may be designed and constructed in the field by qualified trail professionals within established project parameters.

The selection, arrangement, and fitting of individual stones may depend on available materials and site conditions. Where these decisions are made in the field, define the applicable design criteria, performance requirements, dimensions, and finished characteristics.

Establish the contractor's field decision-making authority and identify which adjustments require additional review or approval.

Define how unforeseen conditions, insufficient suitable stone, changes in material sources, or additional stonework requirements will be addressed.

Completed Work / Deliverables

Depending on the scope, completed work may include:

  • Stonework completed in accordance with approved locations, design criteria, construction specifications, and required finished characteristics.

  • Required stone sourced, transported, shaped, fitted, and placed.

  • Associated excavation, foundation preparation, bedding, backfill, drainage, and finishwork completed as specified.

  • Stonework integrated with surrounding tread, structures, drainage, and adjacent terrain.

  • Material collection areas and other disturbed areas restored in accordance with project requirements.

  • Required inspection records, as-built information, and other construction documentation provided.

Quality Assurance + Approval

The solicitation should define how completed stonework will be evaluated and approved, including:

  • Conformance with approved locations, design criteria, specifications, and authorized field adjustments.

  • Compliance with specified stone characteristics, dimensions, and material requirements.

  • Conformance with established workmanship, stability, durability, and performance requirements.

  • Required finished appearance, surface characteristics, and level of finish.

  • Integration with surrounding tread, drainage, structures, and terrain.

  • Compliance with material collection restrictions, resource-protection measures, and permit conditions.

Identify any required inspections during construction, including inspections of foundations or other components before they are concealed.

Define who is responsible for evaluating and approving the work and any specialized expertise or review required.

Pricing & Payment Considerations

Stonework may be included within the overall trail construction price or separately quantified and priced.

Common pricing approaches include:

  • Included in the trail tread unit price or overall lump-sum construction price.

  • Unit pricing per linear foot, square foot, individual step, structure, or other applicable unit.

  • Different unit rates for defined types of stonework or construction conditions.

  • Lump-sum pricing for a defined structure, feature, or group of stonework elements.

  • Time and materials where the extent or complexity of work cannot reasonably be quantified in advance.

Clearly define what each price includes, particularly material sourcing, collection, transportation, handling, shaping, placement, and associated construction.

Where stone is owner-supplied, identify where materials will be made available and who is responsible for transporting them to the construction location.

Define how completed quantities will be verified for payment and how changes in quantities, material availability, or construction requirements will be authorized and priced.

Common Scope & Contracting Issues

  • Assuming suitable stone is available onsite without adequately investigating its availability, characteristics, or collection restrictions.

  • Not clearly defining the intended function, extent, dimensions, or finished characteristics of stonework.

  • Not adequately accounting for the time, equipment, access, and specialized skills required to source, move, and place stone.

  • Not clearly assigning responsibility for stone sourcing, supply, and transportation.

  • Over-prescribing individual stone placement where field-fit construction is intended, or providing insufficient direction for field decision-making.

  • Not defining expectations for workmanship, appearance, or level of finish.

  • Not addressing associated foundation preparation, backfill, drainage, and integration with surrounding tread.

  • Using uniform unit prices without considering differences in stonework types, material availability, or construction complexity.

  • Not establishing how completed stonework will be evaluated and approved.

  • Not establishing how unforeseen conditions, insufficient suitable stone, or additional work will be addressed and priced.

Previous
Previous

Trail Structures

Next
Next

Specialty Trail Features