Trails Master Planning for Muskingum Watershed Conservancy District (Ohio)

MWCD is asking for proposals to develop a master trails plan that would outline future trail development within the district. MWCD is a political subdivision located in eastern Ohio and was created for flood control and mitigation. MWCD manages over 42,000 acres of land and 16,000 acres of water spread throughout 10 reservoirs.

Supply & Installation of 2 pre-engineered bridges in AK

The Waterfall to Ptarmigan Bridges and Trail Construction Project is for the supply and installation of 2 pre-engineered steel trail bridges, spanning approximately 50 feet across Waterfall Creek and 80 feet across Ptarmigan Creek, and for the construction of approximately 2.8 miles of new trail between these bridges on the Chugach National Forest north of Seward, Alaska. Trail construction methodology will follow a linear grading model where design features are guided by specifications listed in the attached Appendix A, Scope of Work, but final features are determined in the field during construction by the contractor with final approval by the USDA Forest Service (FS) Representative.

Rehab and Construction of Singletrack Trail in MN

COGGS (Cyclists of Gitchee Gumee Shores) invites proposals for the rehabilitation,
widening, and necessary water management for approximately ±4,000 feet of existing bike-optimized, machine-built singletrack. Builder will need to follow Specification 15 in the “Trail Specification Matrix”. This trail segment is vital as it will seamlessly connect with a newly constructed “Universally Accessible Trail” scheduled for completion in the summer of 2024. The primary objective of this maintenance project is to create a fully inclusive loop accessible to all mountain bike riders, including those with adaptive bikes.

Holistic and Sustainable Trails Plan for Midewin National Tallgrass Prairie (MNTP) in IL

The National Forest Foundation and U.S. Forest Service invite experienced trail planning consultants to submit quotes for the development of a Holistic and Sustainable Trails Plan for Midewin National Tallgrass Prairie (MNTP). The Trails Plan will be the roadmap to develop and maintain a shared use network of non-motorized trails that span the 15,000+ acres at Midewin National Tallgrass Prairie and increase connectivity with adjacent communities and other public lands.

Trail Construction Project in PA

The Rothrock State Forest- Musser Gap trail construction project was developed through recommendations made in a forest-wide trail assessment, the purpose of which was to provide options and recommendations toward decreasing the natural surface trail density and visitor crowding in the Forest and creating a more manageable, sustainable trail system.

Request for a Project Manager/Construction Management in Canada

MORATA has received approval to construct a number of trails and we are looking for a project manager (PM) to manage our project from start to finish. All trail construction must be completed in 2 summers (trail completion to be complete no later than September 30th, 2025). The PM will be responsible for providing services to meet the deliverables as outlined in 2.0 Scope of Work of the RFP.

Construction of Multi-Use Trail in TX

Approximately 20-25 miles of natural and improved surface trails which will include both bicycle and hiking uses, are proposed. The primary purpose of which is to provide an excellent outdoor experience for visitors with a range of abilities. The Project also includes design, procurement and installation of Fiberglass Reinforced Polymer (FRP) or similar, bridges as a part of the trail system.

Natural Surface Hiking Trail Construction in WY

To Whom would you like your solicitation available: Open to the Public

Project Title: Drifter - Red Grade Trails

Project Solicitation Number (if any):

Project Description: The general components of the work to be performed under these plans and specifications include, but are not limited to, furnishing and installing approximately 4,900 +/- linear feet of non-motorized, hiking only, bidirectional, 24” – 36” natural surface trail as part of the Red Grade Trails System.

Company/Organization/Agency Submitting Contract: Sheridan Community Land Trust

Primary Contact for Contract Information: Jared Koenig

Email Address: jared@sheridanclt.org

Closest City to Project: Sheridan

State/Province/Region: Wyoming

Country: USA

Pre-Bid Meeting Date:

Pre-Bid Meeting Time:

Anticipated Project Start Date:

Application Deadline:

Additional Project Bid Information: The trail constructed through this Request for Proposal (RFP) is on the northeastern slope of the Big Horn Mountains, approximately nine miles southwest of the town of Big Horn, Wyoming.

Date Submitted to PTBA: March 11, 2024 — updated RFP uploaded 3/12/24

Construction of MTB and Hiking Trails in MN

Construction of approximately 7.5 miles of beginner to intermediate level mountain bike trails conforming to International Mountain Biking Association (IMBA) design guidelines and standards. 
2. Construction of approximately 2.5 miles of pedestrian hiking trails conforming to Minnesota Department of Natural Resources (MnDNR) Trail Planning, Design, and Development Guidelines and US Forest Service (USFS) Outdoor Recreation Accessibility Guidelines.